accurate to time period modelled and based on actual photographic evidence where possible
Heavy Die-cast metal chassis
Gift cards can be exchanged for goods online at accurascale
in the period between May 1991 (when the first electrification mast was planted) and June 1993 (when load bank testing was completed)
50007 was outshopped in Great Western Railway lined green with cast numbers and double arrow in February 1984 as part of the GW150 celebrations that were planned for the following year
BR Coil A/SFW Steel Wagon TOPS Bauxite - Pack E Locomotive Class_57XX Pannier accurate to time period modelledBritish Railways Coil A Steel Coil Wagons Three wagon multi pack Containing three wagons, numbered: B949166 B949174 B949133 Bauxite livery Diagram 1 412, Lot 3450 Oleo Buffers Roller bearing axle boxes Introduced in 1962 50 wagons built to this pattern Nylon hood supported by three movable bars for protecting loads Remained in service until 1992 Ran in block rakes, and mixed with other steel wagons such as Coil B, Coil E, Coil G, Coil L and Coil T, as